Here you find important information about planned rail construction that may affect your trip with FlixTrain. Check out which temporary stops or timetable deviations may apply for your trip below.

FLX10 – Berlin – Frankfurt  – Stuttgart/Basel 

Due to engineering works (by DB InfraGO AG), from 27.07. to 15.08. all trains will have extended times in Berlin (later arrival or earlier departure). In the case of several trips, the stops in Berlin-Gesundbrunnen will also be cancelled.

FLX11 – Berlin – Frankfurt – Mainz

Due to engineering works (by DB InfraGO AG), from 27.07. to 11.08. all trains will have extended times along the entire route (later arrival or earlier departure). In the case of most trips, the stops in Berlin-Spandau will also be cancelled.

Due to engineering works (by DB InfraGO AG), from 18.07. to 29.07. all trains will not stop at Frankfurt Airport long-distance station. Alternatively, the trains stop at Frankfurt Airport regional station.

FLX20 – Hamburg – Cologne

Due to engineering works (by DB InfraGO AG), from 22.07. until 02.08. all trains will not stop in Duisburg, Mülheim (Ruhr), Essen and Bochum. For certain trains Gelsenkirchen will be offered as an alternative stop.

Due to engineering works (by DB InfraGO AG), from 03.08. until 04.08. all trains running to Cologne will not stop in Duisburg and Essen. No alternative stop will be provided.

FLX30 – Aachen – Cologne – Berlin – Dresden

Due to engineering works (by DB InfraGO AG), from 22.07. until 02.08. all trains will not stop in Duisburg, Essen and Bochum. Gelsenkirchen will be offered as an alternative stop.

FLX35 – Hamburg – Berlin – Leipzig

Due to engineering works (by DB InfraGO AG), from 27.07. to 15.08. all trains will have extended times in Leipzig (later arrival or earlier departure). The afternoon trains will be cancelled between Berlin and Leipzig.